14
HARDWARE INSTALLATION
Installation Steps
This section will explain how to install PG5-1802-M12XB-10GSFP-24-67 series.
Installation Steps
Step 1.
Unpack the industrial Ethernet switch from the original packing box.
Step 2.
To hang the industrial Ethernet switch on a wall, please refer to the Mounting Installation section.
Step 3.
Power on the industrial Ethernet switch and then the power LED light will turn on.
•
If you need help on how to wire power, please refer to the
Power Inputs
section.
•
Please refer to the
LED Indicators
section for LED light indication.
Step 4.
Prepare the M12 cable for Ethernet connection.
Step 5.
Insert one side of the M12
cable into switch’s Ethernet port and on the other side into the
networking device’s Ethernet port
. The Ethernet por
t’s (
L/A) LED on the industrial Ethernet switch
will turn on when the cable is connected to the networking device.
•
Please refer to the
LED Indicators
section for LED light indication.
Step 6.
When all connections are set and the LED lights all show normal, the installation is complete.