background image

 

13 

 

Hardware Installation 

Installation Steps 

This section will explain how to install PT2-0800 series.

 

 

Installation Steps

 

Step 1. 

Unpack the industrial Ethernet switch from the original packing box.

 

Step 2. 

Check if the DIN-Rail bracket is screwed on the industrial Ethernet switch.

 

 

If the DIN-Rail is not screwed on the industrial Ethernet switch, please refer to the 

DIN-Rail 

Mounting

 section for DIN-Rail installation.

 

 

If you want to wall mount the industrial Ethernet switch, please refer to the 

Wall Mounting

 

section for wall mounting installation.

 

Step 3. 

To hang the industrial Ethernet switch on a DIN-Rail or wall, please refer to the 

Mounting 

Installation

 section.

 

Step 4. 

Power on the industrial Ethernet switch and then the power LED light will turn on.

 

 

If you need help on how to wire power, please refer to the 

Wiring the Power Inputs

 section.

 

 

Please refer to the 

LED Indicators

 section for LED light indication.

 

Step 5. 

Prepare the twisted-pair, straight-through category 5 cable for Ethernet connection.

 

Step 6. 

Insert one side of the RJ-45 cable into switch’s Ethernet port and on the other side into 

the networking device’s Ethernet port, e.g. switch PC or server. The Ethernet port’s (RJ-45) 

LED  on  the  industrial  Ethernet  switch  will  turn  on  when  the  cable  is  connected  to  the 

networking device.

 

 

Please refer to the 

LED Indicators

 section for LED light indication.

 

Step 7. 

When  all  connections  are  set  and  the  LED  lights  all  show  normal,  the  installation  is 

complete.

 

Summary of Contents for PT2-0800 Series

Page 1: ...Leonton PT2 0800 Series PT2 0800 PT2 0800 T User Manual Version 1 0...

Page 2: ...t not limited to the implied warranties of merchantability and fitness for a particular purpose Leonton Technologies Co Ltd may make improvements and or changes to the product and or specifications of...

Page 3: ...the equipment off and on the user is encouraged to try to correct the interference by one or more of the following measures Reorient or relocate the receiving antenna Increase the separation between t...

Page 4: ...ysical Dimensions 3 Front Panel 4 Top View 4 LED Indicators 5 Ethernet Ports 5 Cabling 7 Wiring the Power Inputs 7 Wiring the Fault Alarm Contact 8 DIP Switch Settings 9 Mounting Installation 10 DIN R...

Page 5: ...with a wide operating temperature of 40 C 75 C this series is designed to meet any needs for industrial automation application and harsh environments Key Features Interface Performance All Copper por...

Page 6: ...on If the DC voltage is supplied by an external circuit please use a protection device on the power supply input Supply by UL Listed industrial use power The industrial Ethernet switch s hardware spec...

Page 7: ...3 Hardware Description Physical Dimensions Figure 2 1 below shows the physical dimensions of PT2 0800 series W x H x D is 30mm x 142mm x 99mm Figure 2 1 PT2 0800 Series Physical Dimensions...

Page 8: ...is shown below in Figure 2 2 Figure 2 2 The Front Panel of PT2 0800 Series Top View Figure 2 3 below shows the top panel of the PT2 0800 series switch that is equipped with one 6 pin removal terminal...

Page 9: ...Connected to network 100Mbps Flashing Networking is active Off Not connected to network 10 LAN Port Green On Connected to network 10Mbps Flashing Networking is active Off Not connected to network PoE...

Page 10: ...ble 2 2 1000BASE T RJ 45 Pin Assignments Table 2 3 Crossover Cable Straight Through Cable Pin Number Signal Pin Number Signal Pin Number Signal Pin Number Signal 1 TP0 3 TP1 1 TP0 1 TP1 2 TP0 6 TP1 2...

Page 11: ...insert the power wire Step 1 Insert the positive and negative wires into the PWR1 V1 V1 and PWR2 V2 V2 contacts on the terminal block connector as shown below in Figure 2 14 Figure 2 14 Power Termina...

Page 12: ...luding power failure or port link failure managed industrial switch only and form a normally open circuit An application example for the fault alarm contact is shown below in Figure 2 16 Figure 2 16 W...

Page 13: ...nd the fault LED will turn on Off Disables the corresponding PORT alarm The relay will form a closed circuit and the fault LED will never turn on B S P On Enables broadcast storm protection B S P Off...

Page 14: ...ure 3 1 The Rear Side of the Switch and DIN Rail Bracket Follow the steps below to learn how to hang the industrial Ethernet switch Step 1 Use the screws to install the DIN Rail bracket on the rear si...

Page 15: ...ull down the bracket on to the rail as shown below in Figure 3 3 Figure 3 3 Stable the Switch on DIN Rail Step 5 Check if the bracket is mounted tightly on the rail Step 6 To remove the industrial Eth...

Page 16: ...ottom of the industrial Ethernet switch Step 3 Use the screws to screw the wall mounting bracket on the industrial Ethernet switch Step 4 Use the hook holes at the corners of the wall mounting bracket...

Page 17: ...the Mounting Installation section Step 4 Power on the industrial Ethernet switch and then the power LED light will turn on If you need help on how to wire power please refer to the Wiring the Power In...

Page 18: ...assist in identifying problems the switch can be easily monitored with the LED indicators which help to identity if any problems exist Please refer to the LED Indicators section for LED light indicat...