Page 2 of 5
STEP 2
STEP 6
STEP 3
STEP 5
Slide the Long Saddle Poles
[C]
into the Steel U-Tube
Poles
[B]
so the saddle poles run parallel to the Floor
Straps. [Fg. 3]
Center the Moon Unit Cover
[G]
over the poles. [Fg. 9]
Attach the Spanner Pole with C-Clip
[D]
to the center of
each Steel U-Tube Pole
[A]
with the C-Clip facing out as
shown.
[Fg. 4 & 5]
Use Bungees
[F]
to secure pole
[D &
E]
cross points as
shown. [Fg. 7 & 8]
C
G
C
C
C
D
D
D
A
E
F
A
A
[Fg.3]
STEP 4
Attach all Spanner Poles
[E]
(five total) to the Saddle
Poles with C-Clip
[D]
as shown. [Fg. 6]
C
D
C
D
E
E
E E
E
E
[Fg. 6]
[Fg. 7]
[Fg. 8]
[Fg. 9]
[Fg. 4]
[Fg. 5]
D
A