Fast commissioning / operating principle
10
MA 258
i
Leuze electronic
3
Fast commissioning / operating principle
Notice!
Below you will find a
short description for the initial commissioning
of the EtherNet/IP
gateway MA 258
i
. Detailed explanations for the listed points can be found throughout the
handbook.
3.1
Mounting
The gateway mounting plate MA 258
i
can be mounted in two different ways:
• using four threaded holes (M6) or
• using two M8x6 screws on the two lateral grooves.
3.2
Device arrangement and selection of the mounting location
Ideally, the MA 258
i
should be mounted so that it is easily accessible near the Ident device
in order to ensure good operability, e.g., for configuring the connected device.
Detailed information can be found in chapter 6.3.1.
3.3
Electrical connection
The devices from the MA 2xx
i
family feature four M12 connectors/sockets which are coded
differently depending on the interface.
The voltage supply (
PWR IN
) as well as the switching inputs/outputs (
PWR OUT
or
PWR IN
)
are connected there. The number and function of the switching inputs/outputs is dependent
on the connected end device.
An internal RS 232 interface is used for connecting the respective Leuze device. Another
internal RS 232 interface functions as a service interface for configuring the connected
device via a serial null modem cable.
Figure 3.1:
MA 258
i
connections
Detailed information can be found in chapter 7.
PWR OUT
VOUT 1
2
3
4
SWIO_2
SWIO_1
GND
FE
5
PWR IN
SWIO_1
SWIO_2
3
2
1
4
5
GND
VIN
FE
HOST / BUS IN
TD+ 1
2
3
4
RD+
RD-
TD-
LEUZE Device
BUS OUT
TD+ 1
2
3
4
RD+
RD-
TD-
M12 connector
(A-coded)
M12 socket
(A-coded)
M12 socket
(D-coded)
M12 socket
(D-coded)