www.leviton.com/evrgreen • 1-877-338-7473 • evrgreen@leviton.com
evr-green
™
Level
2 -
Network Charging Station For Public Applications
Step 4 - Install J-Bolts and conduit
Install J-Bolts and conduit into concrete
as illustrated. Use the supplied base
plate template to ensure correct
alignment.
IMPORTANT:
• The concrete block must measure
at least 18” (46 cm) on all sides.
Check local codes to ensure
compliance.
• The J-Bolts must extend at least
2 ½” (6.4 cm) above the concrete.
• The conduit must extend 12” to 24”
(30 to 61 cm) above the concrete,
or according to local codes.
Conduit must extend
12-24” (30-61 cm)
above the concrete
(check local codes)
J-Bolts must
extend at least
2 ½” (6.4 cm)
above the
concrete
FRONT
ANCHOR BOLT PATTERN
CONDUIT WITHIN THIS AREA ONLY
BOLLARD OUTSIDE ENVELOPE
0.50
(12.7)
02.00
(50.8)
8.0
(203.20)
05.87
(149.2)
2-5