evr-green
™
Level
2 -
Network Charging Station For Public Applications
www.leviton.com/evrgreen • 1-877-338-7473 • evrgreen@leviton.com
Step 5 - Mount base plate/pole assembly
Pull all three wires up through the
conduit and the mounting pole.
Place the base plate/mounting pole
assembly over the wiring conduit and
attach the base plate to the J-Bolts
using the installer-supplied nuts and
washers as shown.
Adjust the nuts as necessary to ensure
the mounting pole is level. When level,
tighten the nuts.
IMPORTANT:
Ensure the base
plate/pole assembly is level by
adjusting the nuts underneath the
base plate.
Position a
level on the
mounting
pole
Adjust these
nuts as
necessary to
ensure
the mounting
pole is level
2-6