evr-green
™
Level
2 -
Network Charging Station For Public Applications
www.leviton.com/evrgreen • 1-877-338-7473 • evrgreen@leviton.com
Before you start
You will need:
• Evr-Green CTMPN Pole Mount Bracket and Evr-Green CTMEN External Shell
• ¾” (20 mm) 0.030” (.76 mm) stainless steel banding
• Banding tool(s)
• #2 Phillips screwdriver
• #2 Slotted screwdriver
• Leviton Provisioning Worksheet and Provisioning Portal Instructions
In
stalling the Evr-Green Pole Mounted Level 2 Station's Body Assembly involves a few simple steps:
1. Check box for correct contents (see page 3-2)
2. Drill hole in pole (see page 3-3)
3. Mount bracket to pole (see page 3-4)
4. Prepare body assembly for mounting (see page 3-5)
5. Mount body to bracket (see page 3-6)
6. Connect wires to wiring terminals (see page 3-7)
These steps are detailed in the remainder of this chapter. When you have completed these steps,
you will be ready to install the holster and cable assembly as described in Chapter 5.
Overview of steps
3
Installing a
Pole Mount
3-1