evr-green
™
Level
2 -
Network Charging Station For Public Applications
www.leviton.com/evrgreen • 1-877-338-7473 • evrgreen@leviton.com
Step 4 - Drill holes in body assembly
Use a ¼” (6 mm) drill to drill out the 2
mounting holes in the back of the body
assembly. These holes are partially
pre-drilled.
Drill out
mounting
holes
4-6