evr-green
™
Level
2 -
Network Charging Station For Public Applications
www.leviton.com/evrgreen • 1-877-338-7473 • evrgreen@leviton.com
Step 3 - Install the cable assembly
Slide the cable assembly into the body all
the way until it is flush with the top of the
front panel.
Note: The Evr-Green CTMBN Bollard Mounting
assembly is used for illustration purposes.
The procedure is identical for the Evr-Green
Level 2 Pole and Wall Mounted Stations.
5-4