MSU-DFX SERIES 

Installation Instruction  

ERP: IIS00344 

03/11/2022  

Rev1.0 

Recessed Grid (T-Bar) 

1.  With fixture body resting face up on a stable surface, open doorframe 

and remove internal reflector(s). 

2.  Removal of door hinge cable from housing is advised. Slide cable 

through slot to disconnect door from housing. Set door aside in a 

clean, safe place.   

3.  Locate provided power entry hole for supply connection.  
4.  A

: For Hazardous Locations: 

Attach provided ½” Hub to hole from 

outside being sure that the gasket mates with the outer surface of the 

fixture. Tighten securely to housing using the nut provided. (Use only 

the one (1)  hub provided. ) Conduit and seal-offs are not provided 

and may be required.    
B: 

For ordinary locations: 

Create the supply entrance by securing 

 

a conduit fitting to ½” trade size hole. 

5.  Remove all debris from the inside of the fixture. 
6.  Prepare a mounting means capable of reliably supporting more than 

the weight of the fixture according to applicable building codes. Ceil-

ing Grid size is standard for 1” & 1.5” T-bar. Please specify other siz-

es when ordering. 

7.  Invert fixture and insert through ceiling opening and lay fixture cen-

tered on T-Bar. (For cleanrooms, verify that the grid has a gasket that 

will contact the fixture flange. ) This step may require two workers.  

8.  Adjust mounting Swing-out support bracket(s) on housing to overlap 

T-bar and support fixture on center web of T-bar. Tighten ¼-20 

screws to transfer weight to T-bar, making sure gasket is com-

pressed and grid is level, without deformation.  

9.  Secure to structure using seismic support cables/wires to holes on 

Swing-out support brackets. (Consult local code for requirements for 

your geographic area.)  
Note: This and all other hardware should be plated or stainless steel 

if installed in a wet or damp location.   

10. Rough in supply conduit and connections according to the NEC/CEC 

and local requirements using minimum 90C supply wiring materials. 

11. Connect grounding conductor to fixture grounding point.  
12. Remove any protective films from the lens or surfaces as provided. 
13. Replace reflector and secure by tightening screws or nuts. 
14. If doorframe hinge cables were disconnected, reattach at this time. 

(Note: Cable supported doors are reversible. ) 

15. Align door with housing and start screws by hand, being careful not 

to cross-thread screws. Start process at two opposite corners for best 

results.  

16. Tightly secure doorframe using a hand screwdriver.   

a.  Do not overtighten.  Maximum 10 inch-pounds torque.  
b.  Ensure that the door gasket makes a continuous seal to the 

ceiling t-bar surface (overlapping door style) or fixture housing 

(inset door style). 

17. Energize fixture with rated voltage from a protected branch circuit. 

Summary of Contents for MSU-DFX Series

Page 1: ...e reflected by surrounding surfaces such as ceilings and walls Since the reflec tive properties of surfaces can vary widely it should be considered as part of site planning Follow the manufactur er s recommendations for selecting appropriate ceiling and wall finishes d IT IS THE RESPONSIBILITY OF THE INSTALLER TO ENSURE THAT PERSONS WILL NOT BE EXPOSED TO EXCESSIVE UV OR OPTICAL RADIATION DURING E...

Page 2: ...ling Burn Allow luminaire to cool before handling luminaire Personal Injury Wear safety glasses and gloves when handling the luminaire to avoid physical injury Avoid direct eye contact with light source Always support the weight of the luminaire Note The models requires an accurate cutout of the luminaire opening It is essential that the opening room side edge be flat to ensure the integrity of th...

Page 3: ... IIS00344 03 11 2022 Rev1 0 Hard Ceiling Flange Cont d Size Width Length 2x2 22 7 8 in 22 7 8 in 2x4 22 7 8 in 46 7 8 in Ceiling Cut Out Dimensions Frame not supplied 1 5 8 Unistrut or equal Ceiling cut out Swing out Support Brackets 4 pcs Width Length ...

Page 4: ...ge This step may require two workers 8 Adjust mounting Swing out support bracket s on housing to overlap T bar and support fixture on center web of T bar Tighten 20 screws to transfer weight to T bar making sure gasket is com pressed and grid is level without deformation 9 Secure to structure using seismic support cables wires to holes on Swing out support brackets Consult local code for requireme...

Reviews: