OPT-X ULTRA™ FIBER RING
(Removal, Installation and Assembly)
Four Opt-X Ultra Fiber management ¼ rings are pre-installed at the factory. To remove, grip the ¼ ring, lift the
Position-Locking Tab, turn counter clockwise until unlocked, and then lift to remove. When removing a half or
full management ring group, simultaneously lift the 2 or 4 Position-Locking Tabs, turn counter clockwise until
unlocked, and then lift to remove.
RING STACKING
Position initial ring unit
(¼, ½, or full) upside down
on a flat surface. Position
additional ring upside down
above initial ring and press
together using sufficient
force to engage stack lock-
ing device.
CAUTION
– always perform
stacking before installing
ring unit into tray.
HALF RING ASSEMBLY
Hold a ¼ ring unit in each
hand, bring the units
together and engage by
placing the tab of the left
unit into the slot of the
right unit.
HALF RING INSTALLATION
Position ½ ring unit over
outer ring slots so the
alignment tabs fit into
slots. Press down and turn
the ½ ring unit clockwise
to engage tabs and lock
into position.
CAUTION
– when installing
into a tray that is in the
enclosure, provide
adequate support under
the tray by placing a hand
under the ring slot area.
Page 9 of 26
PK-93470-10-02-0A
FULL RING ASSEMBLY
Hold a ½ ring unit in each
hand, bring units together
with tabs above slots,
rotate to engage tabs.
FULL RING INSTALLATION
Position full ring unit over
inner and outer ring slots
so alignment tabs fit into
slots. Firmly press down
and turn the full ring unit
clockwise to engage tabs
and lock into position.
CAUTION
– when installing
into a tray that is in the en-
closure, provide adequate
support under the tray by
placing a hand under the
ring slot area.
HALF RING ASSEMBLY
FULL RING ASSEMBLY
RING STACKING
Tab
Stacking/Locking
Device (Upper)
Stacking/Locking
Device (Lower)
Slot
Alignment
Slots (Outer)
Alignment
Slots (Inner)
Ring Overview
Ring Side Profile
Ring Alignment Slots
Position-Locking Tab
Turn
Push