INSTALLATION
OUTSIDE MOUNT (OM)
STEP 1: MARK THE BRACKET LOCATIONS
• Using the notches in the headrail as a guide for bracket placement, mark the
locations of the bracket. Only two screws are needed per bracket and they should
be placed in bracket holes diagonally from each other.
• Use a level to check for levelness.
12
Cord Loop Lift Control
OUTSIDE MOUNT (OM)
Bracket
Summary of Contents for Corded Lift Control
Page 22: ......
Page 23: ...Persianas natural INSTALACI N MANEJO CUIDADO Control de elevaci n con cuerda...
Page 44: ...2020 LEVOLOR Inc 5775 Glenridge Drive Building A Atlanta GA 30328 1011801 19 0050 032...
Page 64: ......
Page 84: ...2020 LEVOLOR Inc 5775 Glenridge Drive Building A Atlanta GA 30328 1011802 19 0050 033...
Page 102: ......
Page 103: ...Control de elevaci n sin cuerda Persianas natural INSTALACI N MANEJO CUIDADO...
Page 120: ...2020 LEVOLOR Inc 5775 Glenridge Drive Building A Atlanta GA 30328 1011800 19 0050 034...
Page 150: ......
Page 151: ...Sistema de funcionamiento motorizado con bater a Persianas natural INSTALACI N MANEJO CUIDADO...
Page 180: ...2020 LEVOLOR Inc 5775 Glenridge Drive Building A Atlanta GA 30328 1011799 19 0050 035...