INSTALLATION
8
INSIDE MOUNT (IM)
STEP 1: MARKING THE BRACKET LOCATIONS
•
Position the box brackets at each end of the headrail to confirm the dimension.
Depending on installation location, box brackets can be attached using the top,
back, or the side holes.
•
Position the center support bracket (if included) in the center, if using only one.
If more than one center support bracket is included, space them evenly along
the headrail.
•
Mark the location of the desired bracket mounting holes, two per bracket, making
sure they are square and equally spaced.
STEP 2: INSTALLING THE BRACKETS
•
Drill pilot holes using a
1
⁄
16
" drill bit using pencil marks as a guide. Depending on the
installation location, box brackets can be attached using the top, back, or side holes.
•
While holding the brackets in place, secure the brackets using two screws per bracket.
•
Ensure all brackets are square with each other.
Motorized Tilt Operation
OR
Screws
(2 per bracket)
Screws
(2 per bracket)
Box bracket
Box
bracket
Center support
bracket(s)
(if included)
Box bracket
Center support
bracket(s)
(if included)