2.
POWER DRAIN
1) The power drainage installation should comply with SECTION 807.1, 2018 UPC.
2) Trap, vent, and connectors should comply with SECTION 1001.1 and 1001.2 UPC.
3) An alternative code needs to be complied with by the states not adopting UPC.
a) Drainage system: SECTION 701.2 and 702.2 IPC (or local plumbing code)
b) Trap, vent, and connectors: SECTION 1002.1 and 1002.2 IPC (or local plumbing code)
4)
The installer/plumber is responsible for obtaining and complying with the local plumbing code for
inspection. If any assistance is required from the vendor’s side, please contact our customer
service.
6
Summary of Contents for LIBERTE
Page 2: ...Identifying Parts for Liberte Model Pedicure Spa with Massage System 1...
Page 3: ...Identifying Parts for Luminous Model Pedicure Spa with Massage System 2...
Page 5: ...2 ASSEMBLE THE BACK AND SEAT CUSHION 3 ASSEMBLE THE ARM RESTS 4...
Page 11: ...PRE OPERATIONAL SETUP 1 SETUP THE Air Jet 2 SETUP THE Eco Jet 10...