2. POWER DRAIN
1) The power drainage installation should comply with SECTION 807.1, 2018 UPC.
2) Trap, vent, and connectors should comply with SECTION 1001.1 and 1001.2 UPC.
3) An alternative code needs to be complied with by the states not adopting UPC.
a) Drainage system: SECTION 701.2 and 702.2 IPC (or local plumbing code)
b) Trap, vent, and connectors: SECTION 1002.1 and 1002.2 IPC (or local plumbing code)
4)
The installer/plumber is responsible for obtaining and complying with the local plumbing code for
inspection. If any assistance is required from the vendor’s side, please contact our customer
service.
6