8
INSTALLATION OF INDOOR
ENGLISH
Ceiling dimension and hanging
bolt location
Install the unit above the ceiling correctly.
Position of suspension Bolt
- Apply a joint-canvas between the unit and
duct to absorb unnecessary vibration.
- Apply a filter Accessory at air return hole.
CASE 1
Confirm the positional relationship between
the unit and suspension bolts.
- Thermal insulator the ceiling opening to clean
the filter or service under the product.
Top view
Unit: mm
Front view
Unit: mm
Front
Inspection hole
600 x 600
Control box
1000
20 or more
Air outlet vents
Air inlet vents
600
600
C
E
G
D
F
I
A
J
B
H
Drain hole
A B C D E
F
G H
I
J
Dimension
Capacity(kW)
(Unit:mm)
5
933.4 971.6 619.2 700
30
270 15.2 858 201.4 900
7
933.4 971.6 619.2 700
30
270 15.2 858 201.4 900
12.5
1283.4 1321.6 619.2 700
30
270 15.2 1208 201.4 1250
13.4
1283.4 1321.6 619.2 700
30
360 15.2 1208 291.4 1250
Selection of the best location
Install the air conditioner in the location that
satisfies the following conditions.
- The place shall easily bear a load exceeding
four times the indoor unit’s weight.
- The place shall be able to inspect the unit as
the figure.
- The place where the unit shall be leveled.
- The place shall easily connect with the out-
door unit.
- The place where the unit is not affected by
an electrical noise.
- The place where air circulation in the room
will be good .
- There should not be any heat source or
steam near the unit
INSTALLATION OF INDOOR
Summary of Contents for ABNQ18GM1A0
Page 26: ......