IMPORTANT :
When the air conditioner drops into the
L
bracket, the air
conditioner will be centered in window opening as shown in
Figure. 28.
b. While steadying the air conditioner, carefully bring the
window sash down behind the upper guide of the air
conditioner, as shown in Figure. 29.
4. SECURE THE GUIDE PANELS
Extend the guide panels (TYPE F) to fill the window
opening using 4 screws (TYPE B) to secure them, as
shown in Figure. 30.
5. INSTALL THE SASH SEAL AND SASH LOCK
a. Cut the sash seal (TYPE E) to the window width. Stuff
the sash seal between the glass and the window to
prevent air and insects from getting into the room, as
shown in Figure. 30.
b. Fasten the
L
bracket using a (TYPE A) screw, as
shown in Figure. 30.
6.
a. Remove the screws that secure the cabinet and base
pan in the right side.
b. Fasten the suport bracket (TYPE G) using a removed
screw. Attach the suport bracket (TYPE G) in the inner
window sill with a screw (TYPE B), as shown Figure.
31.
7. Window installation of room air conditioner is now
completed. See ELECTRICAL DATA for attaching
power cord to electrical outlet.
3.2.4 HOW TO SECURE THE DRAIN PIPE
In humid weather, excess water may cause the BASE
PAN to overflow. To drain the water, remove the DRAIN
CAP and secure the DRAIN PIPE to the rear hole of the
BASE PAN. (Figure. 32)
Press the drain pipe into the hole by pushing down and
away from the fins to avoid injury.
—15—
CENTER LINE
SEAL
WINDOW FRAME
BOTTOM
GUIDE
ABOUT
1
/
4
"
L
BRACKET
UPPER GUIDE
DRAIN PIPE
DRAIN CAP
hang
push
TYPE B
SASH SEAL
(TYPE E)
L
BRACKET
TYPE A
TYPE B
Support Bracket (TYPE G)
1
2
Figure 28
Figure 29
Figure 30
Figure 32
Figure 31