Installation
31
Install
ation
2
ATS, BMS, EV METER Communication Connections
Connect the supplied communication connector to the battery, ATS and EV communication. After
making a connection, connect the commnication connector to the PCS.
BMS 1
BMS 2
EV Meter
ATS
bMs1
q
RS485_High
r
RS485_Low
o
Enable
p
GND
bMs2
m
RS485_High
n
RS485_Low
k
Enable
l
GND
eV Meter
i
RS485_A
j
RS485_B
ATs
g
+12V_ATS
h
BLACK_ATS
e
GND_ATS
f
SW_ATS BOX
c
EN_ATS
d
K3_ATS
a
K14_ATS
b
GND_ATS
Connect / Disconnect the connector
< connection >
< disconnection >
CAUTION
Recheck the communication connection. If the communication
connector is not connected properly, an error may occur.