3.1.5 Clearance
5HFRPPHQGHGFOHDUDQFHVIRUWKHOHIWULJKWDQGWRSRIWKHSURGXFWDUHVKRZQLQWKH¿JXUHIRU
the proper ventilation and installer convenience.
Ceiling
Floor
500 mm
(20")
300 mm
(12")
300 mm
(12")
Ceiling
Floor
500 mm
(20")
300 mm
(12")
300 mm
(12")
300 mm
(12")
<Standing type>
<Wall Mounting type>
3.1.6 Tools & Safety Gear Required
Tools
The following tools are required to install the battery pack :
Precision screwdriver
M5 torque wrench
Inclinometer
Drill
(min. diameter 10 mm, 0.4")
Pencil or marker
Tape measure
7KHIDVWHQHUVDUHQHHGHGIRU¿[LQJWKHEUDFNHWRQWKHZDOO
Safety Gear for Personal Protection
It is required to wear the following safety gears when handling the battery pack.
Insulated gloves
Safety goggles
Safety shoes
3.1.7 Appearance and Dimensions
Appearance
Proper handling and care are recommended as disassembly, change of color,
VFUDWFKHVOHDNDJHRIOLTXLGDQGVWDLQVPD\LQÀXHQFHWKHHFRQRPLFYDOXHRIWKH
battery pack.
Pack appearance and dimensions
817 mm
(32.2”)
295 mm
(11.6")
504 mm
(19.8")
Color and materials
- Battery Module front/rear case:
metallic gray, steel
- Battery Control Unit cover &
Module Connect Plate: metallic gray,
aluminum
- LED cover: black, plastic
3.1.8 System Clearance
7KHEDWWHU\UHTXLUHVDGHTXDWHFOHDUDQFHIRULQVWDOODWLRQFDEOLQJDQGDLUÀRZ7KHPLQLPXP
FOHDUDQFHIRUV\VWHPFRQ¿JXUDWLRQLVSURYLGHGEHORZ7KHFDEOHFRQQHFWLQJEHWZHHQEDWWHU\
pack and inverter should be in accordance with the installation guide manual of the inverter.
NOTE
An external DC isolator may be installed within the clearance zone. Minimum clearances
may be greater according to local regulations.
Inverter
Floor
500mm
(20”)
300mm
(12”)
300mm
(12”)
500mm
(20")
300mm
(12")
300mm
(12")
Inverter
Ceiling
Floor
Inverter
500mm
(20”)
300mm
(12”)
300mm
(12”)
500mm
(20")
300mm
(12")
300mm
(12")
300mm
(12")
Inverter
Ceiling
Floor
<Standing type>
<Wall Mounting type>
3.1.9 Installing the Battery Pack
3.1.9.1 Standing Type
CAUTION
0DNHVXUHWKDWWKHLQYHUWHU$&DQG'&GLVFRQQHFWVDUHWXUQHGR൵EHIRUHFRQQHFWLQJWKH
power cable to the battery pack.
Install the battery pack through the following steps:
Area1
OK
OK
Ex) If min. clearance is 200mm,
305mm
203mm
Area2
5(6
8+
3U
LPH
'U
LOO7H
PSOD
WH
Area2
Area1
Ex) If min. clearance is 200 mm,
Wall
Ok
Ok
203 mm
305 mm
1. Place the Drill template to the wall
where the battery pack will be
installed. After that, drill holes on the
position marked on the Drill template.
* Recommended fastener count:
1(Area1)/1(Area2)
* Recommended fastener diameter/
length: 10mm/40mm Min.
* Fastener separation should observe
the regional building code.
* Check “
RESU10H Prime
Standing
” on the middle side of
Drill Template before drilling.
Front
MODULE CONNECT
LATE 1
ୋ
Rear
Front
Wall direction
Front
Wall
direction
2. Place a spacer to the position marked
on the Drill template. After that, place
the Module connect plate in contact
with the Spacer and align center lines.
* Pay attention to the direction of
the Spacer. Refer to left image for
correct orientation.
*
'RQRWXVHDQFKRUEROWVWR¿[WKH
0RGXOHFRQQHFWSODWHWRWKHÀRRU
* Be careful not to damage the
aluminum foil attached on the
bottom of Module connect plate
during handling.