15
INSTALLATION
ENGLISH
Unpacking the
Appliance
Lifting the Appliance Off the
Foam Base
* This feature may vary depending on
the model purchased.
After removing the carton and shipping
material, lift the appliance off the foam
base.
• Make sure the tub support
a
* comes
off with the base and is not stuck to the
bottom of the appliance.
• If you must lay the appliance down to
remove the carton base
b
, always
protect the side of the appliance and
lay it carefully on its side. Do not lay the
appliance on its front or back.
Removing the Transit Bolt
Assemblies
To prevent the appliance from severe
vibration and breakage, remove transit
bolts and retainers.
1
Starting with the bottom two transit
bolts
a
, use the spanner (included) to
fully loosen all transit bolts by turning
them counterclockwise.
2
Remove the bolt assemblies by
wiggling them slightly while pulling
them out.
3
Install the hole caps.
• Locate the hole caps
b
included in
the accessory pack or attached on
the back.
NOTE
• Save the transit bolts and retainers for
future use.
• Transport this appliance for the
prevention of breakage as below:
- The transit bolts are reinstalled.
- The power cord is secured to the
back of the appliance.
*
global_main.book.book Page 15 Wednesday, September 2, 2020 4:40 PM