6. Commissioning
6-1. Delivery and Installation Check
76
6. Co
mmi
ss
i
o
ning
ENGLISH
From delivery and installation up to commissioning
Installation of base
(
B
ase panel)
Delivery, Installation
Tightness test
Vacuum and shelf test
Refrigerant charging
Insulation resistance test
Starter panel~control
panel operation test
Operation test for
the safety devices
Inspection before startup
Startup and after
startup inspection
Stop
Operation under load and
operation adjustment
Chilled water pump operation
cooling water pump operation
Draw up operation data
Chilled water and cooling
water quality analysis
Operation guidance
Finishing
Unsatisfactory
Add pressure
with nitrogen gas
If you have about
one month or more
until Operation start.
Wiring construction between
Starter panel and Control panel.
(The order can be reversed.)
Exception : In the case that
the refrigerant was charged
in the Chiller at the factory
Figure 52 Procedure from delivery to commissioning