07

Parallel Connection

The solar modules may be combined in parallel to

produce the desired current output.

When modules are combined in parallel, the total

current is equal to the sum of currents from each

module.

The voltage of each module connected in parallel

should be the same.

When connecting plural strings of modules in parallel

every series string or solar module must be fused prior

to combining with other strings.

Abide with all applicable federal, state, and local codes

for additional fusing requirements and limitations on

the maximum number of solar modules in parallel.

Earth Grounding 

All work must be conducted in conformance with all

Federal, State, and local codes and standards.

Grounding works should be performed by an

authorized installer for the safety and maintenance of

the system in accordance with all national, state and

local electrical codes and regulations and standards.

Where common grounding hardware (nut, bolts,

washers) is used to attach a listed grounding device,

the attachment must be made in conformance with the

grounding device manufacturer’s instructions.

All hardware should be consist of corrosion resistant

material such as stainless steel.

There is an earth hole on the edge of the module

frame. Using this hole, an earth conductor and the

solar module frame may be recommended to be

connected and earthed as the below drawing.

Bonding points to ground should be tight, secure and free

from corrosion. (Maintenance is especially important in areas

with high levels of salt in the atmosphere, such as coastal

areas and the surrounding seas.)

To prevent electric shock and fire, a protective ground

must be done on the frames of solar modules and arrays

safety class II. The national directives must be respected.

although the solar modules from LG meet the conditions of

All screws and nuts shall be tightened to a torque of

4~5 N∙m.

Module frame
Bolt

Flat washer

Star washer

Cup washer
Grounding wire

Spring washer
Nut

Flat washer

Maximum series fuse rating is refer to “Product

Specifications; page 11”.

Parallel connection for more current

-

+

…………

+

-

+

-

-

+

-

+

LG Electronics recommends a size no smaller than

4mm  .

2

General Wiring

LG Electronics recommends that all wiring be double

insulated with a minimum rating of 90°C (194°F).

The minimum size should be determined by the

applicable codes.

All wiring should use a flexible copper (Cu) conductor.

and location of grounding holes is provided in “Product

Specific information on the solar module dimensions

Specifications”.

One M4 stainless steel bolt, one nut, one spring

washer and 12 AWG Cu wires are recommended per

mounting hole.

washer, two flat washers, one cup washer, one star

A multiplying factor is required for increased output

of the PV modules. Under normal conditions, a PV

module is likely to experience conditions that produce

more current and/or voltage than reported at standard

test conditions. The requirements of the National

Electrical Code (NEC) in Article 690 shall be followed

to address these increased outputs.

The values of Isc and Voc marked on this PV module

should be multiplied by a factor of 125% when

determining component voltage ratings, conductor

ampacities, fuse sizes, and size of controls to the PV

output.

Depending on national directives, additional safety

factors might be applicable for over current protection.

Parallel configuration is not limited if proper measures 

are taken to block the reverse current flow, e.g. fuses 

for the protection of the module and cables from over 

current.

LG Electronics recommends to take blocking diode for 

prevention of unbalaced string voltage.

The reverse current flow in the string may be caused 

by a module short circuit, incorrect wiring, shadow, etc.

Blocking diodes must have : 

1) VRRM(Repetitive Peak Reverse Voltage) : 

    1.5times of maximum system voltage

2) IF (Average Forward Current) : 

    2 times of Isc (PV module short circuit current)

 It is selected in consideration of the thermal 

characteristics of the diode, and it is recommended 

to use a component of 30mA or less for IRRM 

(Repetitive Peak Reverse Current, max).

Summary of Contents for LG N1K-N6 Series

Page 1: ...Please read this manual carefully before operating your set and retain it for future reference N TYPE MODEL www lg solar com Installation manual PV Solar MODULE LGXXXN1K N6 ...

Page 2: ...onnection 07 General Wiring 07 Earth Grounding 07 MECHANICAL INSTALLATION 08 Module Mounting 08 Site Consideration 08 Mounting Methods 08 DISCLAIMER OF LIABILITY DISPOSAL 10 TRANSPORTING AND STORAGE 11 REVISIONS TABLE 11 PRODUCT SPECIFICATIONS 12 Electrical Mechanical Properties 12 Dimensions of Modules 14 Mechanical Installation methods Bolting Clamp Information Unloading Flow Guide 15 17 18 APPE...

Page 3: ...ed modules must be treated with safety protection equipment Failure to comply may result in serious bodily injury or death No electrical parts like cables are located after installation between laminate and mounting structure Do Not reconnect or repair junction box cable It may occur spark or electric shock Do not bending junction box s cable While under stress it may occur module damage Cable ben...

Page 4: ...the junction box of the module or pull the cable Do not remove the labels attached to the module Failure to comply may result in damage of the product If the installing modules on curved surface e g arch type as shown in the below picture do not forcefully modify the module in the installation when connecting it with the structure Only install the module in the place where the structure for the pa...

Page 5: ... and system output and may be the reason for the damage of solar module Dirt build up on the surface of the panel may cause active solar cells to be shaded and electrical performance to be impaired conditions of 1000W m2 irradiance and 25 C 77 F solar cell temperature Colder temperatures may substantially increase voltage and power Industry standard rated specifications are made at site Keep flamm...

Page 6: ... connections Modules may be connected in series and or parallel to achieve the desired electrical output as long as it sheet Please use only the same type of modules in a combined source circuit Do not disconnect the module under when it is operating Shock hazard may occur near the solar modules connection means When the module installing in series or in parallel e g using for extension cables etc...

Page 7: ...sher Grounding wire Spring washer Nut Flat washer Maximum series fuse rating is refer to Product Specifications page 11 Parallel connection for more current LG Electronics recommends a size no smaller than 4mm 2 General Wiring LG Electronics recommends that all wiring be double insulated with a minimum rating of 90 C 194 F The minimum size should be determined by the applicable codes All wiring sh...

Page 8: ...e that there is no shadowing affected by building chimney tree and neighboring module etc Mounting Rails No of Cell Do not use module to replace or partly replace roofs and walls of living places Mounting Methods General Information Select the appropriate orientation to maximize sunlight exposure The module generates maximum output power when it faces the sun directly The tilt angle of the modules...

Page 9: ...ch module should be securely fastened at a minimum 4 points on two opposite sides and location of mounting holes is provided in Product Tighten the bolt securely by using the combination Place the spring washer between the Flat washer and Nut Mounting by using clamps The module may be fastened to a support by using clamps on both the long edge and the short edge of the modules provided in Mechanic...

Page 10: ...lectrical products can contain hazardous substances so correct disposal of your old appliance will help prevent potential negative consequences for the environment and human health Your old appliance may contain reusable parts that could be used to repair other products and other valuable materials that can be recycled to conserve limited resources 3 You can take your appliance either to the shop ...

Page 11: ... occur Packaged modules should be stored in a cool and dry place The module packaging is not water weatherproof If stored for a long time in an uncontrolled environment it can cause discoloration problems of solar module This installation manual Version 1 replaces all previous versions except electrical and mechanical characteristics For electrical and Mechanical characteristics of each model plea...

Page 12: ...TC Vmpp at STC Impp at STC Max Series Fuse Rating Max No of module in series Max System Voltage Connector Length Width Height Weight W V A V A A V mm mm mm kg 40 6 10 83 33 9 10 35 40 8 10 93 34 0 10 44 41 0 11 03 34 3 10 51 41 2 11 13 34 5 10 60 41 4 11 23 34 7 10 68 41 5 11 33 34 9 10 75 41 7 11 43 35 2 10 83 18 5 18 5 18 5 18 5 18 5 18 5 18 5 MC4 05 8 PV CO02 MC4 05 8 PV CO02 MC4 05 8 PV CO02 M...

Page 13: ...pp A Open Circuit Voltage Voc V Short Circuit Current Isc A 264 31 9 8 29 38 2 8 72 355 268 32 0 8 36 38 3 8 80 360 272 32 3 8 42 38 5 8 88 365 276 32 4 8 49 38 7 8 96 370 279 32 7 8 56 38 9 9 05 375 283 32 9 8 61 39 1 9 13 380 287 33 1 8 68 39 3 9 21 LGXXXN1K N6 NMOT Nominal Module Operating Temperature Irradiance 800W m ambient temperature 20 wind speed 1m s 2 PRODUCT SPECIFICATIONS ...

Page 14: ...14 Dimensions of Modules 60Cell Module Unit mm in LGXXXN1K N6 Frame Cross section Note Cable length with connector MC4 05 8 PV CO02 Long Frame Short Frame ...

Page 15: ... Pa Position mm 240 440 5400 4000 Load Front Rear Pa Position mm 234 or 334 5400 4000 Load Front Rear Pa Position mm 240 440 5400 4000 Load Front Rear Pa Position mm 0 300 5400 2400 Load Front Rear Pa Position mm 0 50 0 650 2400 2400 A B Fig 3 Clamping Type Note All mechanical installation methods and bolting method in this appendix were not tested by CSA or 3rd party It is evaluated by LG interna...

Page 16: ...ar Pa Position mm 0 50 0 650 2400 2400 A B Load Front Rear Pa Position mm 240 440 4000 4000 Fig 7 Clamping Type Fig 8 Clamping Type Fig 9 Clamping Type APPENDIX Mechanical Installation 60Cell Model 16 Note All mechanical installation methods and bolting method in this appendix were not tested by 3rd party It is evaluated by LG internal test 0 4 4 0 4 2 ...

Page 17: ...shers and eight flat washers are recommended per solar module Bolting Method Clamp system requirements Use corrosion resistant material clamps and hardware E G L y b y t i l i b i t a p m o c r o f t s e t o t s d e e n t i p m a l c l a i c e p s a e s u u o y f I The clamp should not be touched with the module s glass Use appropriate bolted connections as per clamp manufacturer s instructions Fo...

Page 18: ... Block Standard Line Rope The position of rope have to be between block 1 and block 2 when you fasten a rope to pallet If you have not timber bar you can use a pallet which is longer than module size The crane hook have to be placed center of packaging For the balance of packaging the rope between the packaging and crane must be the same length Step 3 Loading unloading packaging A minimum of two o...

Page 19: ...ea Contact solarinfo lge com http www lg solar com LG Electronics Deutschland GmbH Alfred Herrhausen Allee 3 5 65760 Eschborn Germany Contact service solar lge de LG LG logo and Life s Good are trademarks of LG Electronics Inc worldwide Trademarks and intellectual properties of LG Electronics Inc are protected by international copyright laws ...