5-12
COMPONENTS
TEST PROCEDURE
RESULTS
CIRCULATION MOTOR
(Wire leads removed)
NOTE:
*( ) = WIRE COLOR
RELAY 4, 6 OF P.C.B
(Disconnect the 9 pin
connector from P.C.B)
See Schematic Dagram on
page 4-3)
RELAY 2, 3, 5 OF P.C.B
(Wire leads removed.)
RY2 : Microwave
RY3 : Grill
RY5 : Convection
NOTE : A MICROWAVE ENERGY LEAKAGE TEST MUST ALWAYS BE PERFORMED WHEN THE UNIT IS
SERVICED FOR ANY REASON.
MAKE SURE THE WIRE LEADS ARE CORRECT POSITION.
WHEN REMOVING THE WIRE LEAD FROM THE PARTS, BE SURE TO GRASP THE
CONNECTOR, NOT THE WIRES.
Relay 2 Relay 3 Relay 5
Cooking Start OFF
CN2
1
3
4
5
9
6
8
Relay 6
Relay 4
COM
(YL)
230V(BL)
Cooking Start OFF
Normal : COM-230V : Approx. 150
Ω
Abnormal : Infinite or several ohm.
LGE Internal Use Only
Copyright © 2009 LG Electronics. Inc. All right reserved.
Only for training and service purposes