COMMUNICATION KIT INSTALLATION
13
E
N
G
L
IS
H
Mechanical installation
1
Remove the Comm. Kit box cover by unscrewing the plastic bolt (6EA)
2
Drill 4 holes on correct position and fix the Comm. Kit box securely with 4 screws
(Field supply) through the provided holes Ø4.5 mm (Reference the length of the holes Ø4.5)
348 mm
3
3
2
m
m
Provided holes
Ø4.5 mm (4EA)
COMMUNICATION KIT INSTALLATION
WARNING
!
• Install where it can sufficiently support the weight of the comm.Kit.
If the support strength is not enough, the outdoor unit may drop and hurt people.
• Install where the comm.kit may not fall in strong wind or earthquake.
If there is a fault in the supporting conditions, the comm.kit may fall and hurt people.
• It is installed at a place with a lot of snowfall, install with the place higher than the most
extreme snowfall amount standard.