8
iR37 Build & Operations Manual • LIBERTY AV
6. Stand the pole up on its base.
Take the main device and unthread the black collar from the underside.
a. Remove the protective film from the top plate.
b. Hold the plate the shiny side is upwards.
c. Thread the captive cable through the top plate central hole.
d. Thread the black screw collar over these cables.
e. Connect cables to power/contact closure/ network.
f. Place the assembly on top of the pillar.
g. Line up the holes in plate and column.
h. Make sure the screen is oriented correctly with the base.
1. Cables should exit the base to the rear.
2. Screen should face away from the cables on the opposite side.
3. If necessary, loosen and rotate upper assembly and top plate; retighten black collar.
4. Check and repeat until satisfied.
i. Now insert two of the screws – only a couple of turns.
j. Tighten one of the screws gently using a screwdriver.
1. This will ensure all holes now line up.
2. Insert remaining three screws.
k. Tighten all screws.
l. Remove remaining cling film from pole.
1. AVOID using a knife or scalpel – the pillar will scratch and sadness, anger and four letter words will follow!!
2. Scissors are best; snip the roll of cling film near the top of the pole. The cling film should then unwind
from the pillar.
3. Clean the metal with a soft lint-free cloth.
m. Screen and pillar are now ready to be switched on and used.
j-1