Page
5
of
15
Glue the bottom and the other half of the
fuse in place using the slots and tabs
provided, lay weights on it until the glue
dries.
Now glue the second 25.250” spar into the
corner of the fuse as shown.
A third small support bulkhead is now
glued in the fuse using the tab and slot
provided.