background image

 

 

Liebert GXT3-5000/6000RT208 

 
SL-23188_REV1_08-10 

13 

Guide Specifications 

2.9 

LIEBERT GXT3 CONFIGURATION PROGRAM 

An included Microsoft Windows-based (Windows 95 or later) Configuration Program and cable shall allow 
configuration of UPS features and operating parameters to meet specific application requirements, if required. 
Options that are configurable via this program shall include: 

 

Select one of five output voltages to match input voltages of 200/100, 220/110, 220/127, 230/115 or 
240/120. 

 

Enable / Disable Auto-Restart. 

 

Select frequency converter operation with a fixed output frequency of 50 or 60Hz. Bypass is disabled 
during Frequency Converter mode. 

 

Set the Low Battery Warning alarm time from 2 to 30 minutes. 

 

Disable the Auto-Battery test. 

 

Set the Auto-Battery test interval to 7, 14, 21 or 28 days. 

 

Select the number of external battery cabinets connected to the UPS to adjust the remaining run-time 
calculations reported by the UPS Liebert software products. 

 

Modify the shutdown setting of the Any Mode Shutdown. 

Summary of Contents for GXT3 5000RT208

Page 1: ...vacuum pumps electric drills laser printers and hair dryers 1 2 STANDARDS The UPS shall be designed in accordance with applicable sections of the current revision of the following documents Where a c...

Page 2: ...DC converter to the inverter to generate computer grade power for the connected load C Recharge When the UPS is supplied with qualified utility power the UPS shall charge connected internal and optio...

Page 3: ...is started on battery with no input power present the default output voltage shall be 120 208V 60Hz from the factory After the UPS has been started from utility the output voltage frequency shall matc...

Page 4: ...all auto sense input frequency of 50Hz or 60Hz when first powered up and shall use this frequency as the default output frequency Once started the input frequency operating window shall be 40 70Hz wit...

Page 5: ...B Voltage Regulation L1 N and L2 N 3 steady state L1 L2 5 steady state C Frequency Regulation 3 5Hz synchronized to utility mains 0 1Hz free running or on battery operation D Frequency Slew Rate 1 0H...

Page 6: ...harge compliant to EN61000 4 2 level 4 Criteria A without damage and shall not affect the connected load 1 5 USER DOCUMENTATION The specified UPS system shall be supplied with a Safety Warning Sheet T...

Page 7: ...llable lead acid cells housed in a separate cabinet that matches the UPS cabinet styling The cabinet shall be cleaned primed and painted Black RAL 7021 The external battery system shall be sized to pr...

Page 8: ...ritical load shall be transferred to internal bypass 2 2 2 Inverters 2 2 2 1 General The UPS inverters shall be of a pulse width modulated PWM IGBT design capable of providing the specified AC output...

Page 9: ...ostics AC Input indicator 1 green LED The AC Input indicator LED shall be illuminated when utility power is available and falls within the input specification UPS ON indicator 1 green LED The On Inver...

Page 10: ...ed load and power factor with an ambient temperature of 77 F 25 C for a minimum of 5 minutes reserve time The expected life of the battery shall be 3 5 years or a minimum 250 complete discharge cycles...

Page 11: ...Liebert GXT3 5000 6000RT208 SL 23188_REV1_08 10 11 Guide Specifications PD2 006 NEMA L14 30P 4 L6 20R Included...

Page 12: ...SLOT COMMUNICATION OPTIONS The UPS shall include one Liebert IntelliSlot communication port to allow the operator to field install optional Liebert IntelliSlot communication cards Liebert IntelliSlot...

Page 13: ...put voltages to match input voltages of 200 100 220 110 220 127 230 115 or 240 120 Enable Disable Auto Restart Select frequency converter operation with a fixed output frequency of 50 or 60Hz Bypass i...

Reviews: