background image

 

 

Liebert GXT3-5000/6000RT208 

 
SL-23188_REV1_08-10 

Guide Specifications 

1.3.2  Design Requirements 

A.

 

Voltage:

 Shall operate at either 120/208V or 120/240V by sensing the utility phase angle and configuring the 

dual inverters to the same angle: 120 or 240 degrees (or) 180 degrees. Nominal input/output voltage 
specifications of the UPS at rated load shall be: 

Input 

The UPS shall automatically configure itself to operate from 120/208V, 50/60Hz (or) 120/ 240V, 50/60Hz 
without the use of selector switches or voltage taps. Input wiring must be 3-wire plus ground (L1, L2, N, G, 
with N solid bonded to G at the distribution panel). 

Output 

Output voltage shall be present at terminals L1, L2 and N. The output voltage shall be automatically set to 
match input voltage of 120/208V, 50/60Hz (or) 120/240V, 50/60Hz. Voltage measured between L1-N and L2-
N: 120VAC ±3%, 50/60Hz; L1-L2: 208 or 240VAC (auto-sensing to match input phase angle) ±5%, 50/60Hz. 
The UPS shall be configurable using the included configuration program to provide the following alternate 
voltages: 

127/220V, 115/230V, 110/220V, 100/200V, all voltages ±3% at 50 or 60Hz. 

(If the UPS is started on battery with no input power present, the default output voltage shall be 120/208V, 
60Hz from the factory. After the UPS has been started from utility, the output voltage/frequency shall match 
the last known input voltage/frequency that was applied.) 

B.

 

Output Load Capacity

: Specified output load capacity of the UPS shall be: 

5000RT208 models 

VA 

Watts 

VAC Output 

2500 

2000 

115 / 120 / 127  

2250 

1800 

110 

2000 

1600 

100 

5000 

4000 

120 / 208 (120 or 240 degree only) 

5000 

4000 

120 / 208 (180 degree only) 

5000 

4000 

127 / 220 (120 or 240 degree only) 

4500 

3600 

110 / 220 (180 degree only) 

5000 

4000 

115 / 230 (180 degree only) 

4000 

3200 

100 / 200 (180 degree) 

6000RT208 models 

VA 

Watts 

VAC Output 

3000 

2400 

115 / 120 / 127 

2700 

2160 

110 

2400 

1920 

100 

6000 

4800 

120 / 208 (120 or 240 degree only) 

6000 

4800 

120 / 208 (180 degree only) 

6000 

4800 

127 / 220 (120 or 240 degree only) 

5400 

4320 

110 / 220 (180 degree only) 

6000 

4800 

115 / 230 (180 degree only) 

4800 

3840 

100 / 200 (180 degree) 

C.

 

Internal Battery:

 Valve-regulated, non-spillable, lead acid cells. 

D.

 

Battery Reserve Time:

 Minimum 4 minutes with an ambient temperature of 77°F (25°C). 

E.

 

Battery Recharge:

 The UPS shall contain a battery recharge rate designed to prolong battery life. Recharge 

time for UPS internal batteries shall be 3 hours maximum to 90% capacity after a complete discharge into 
full load. 

Summary of Contents for GXT3 5000RT208

Page 1: ...vacuum pumps electric drills laser printers and hair dryers 1 2 STANDARDS The UPS shall be designed in accordance with applicable sections of the current revision of the following documents Where a c...

Page 2: ...DC converter to the inverter to generate computer grade power for the connected load C Recharge When the UPS is supplied with qualified utility power the UPS shall charge connected internal and optio...

Page 3: ...is started on battery with no input power present the default output voltage shall be 120 208V 60Hz from the factory After the UPS has been started from utility the output voltage frequency shall matc...

Page 4: ...all auto sense input frequency of 50Hz or 60Hz when first powered up and shall use this frequency as the default output frequency Once started the input frequency operating window shall be 40 70Hz wit...

Page 5: ...B Voltage Regulation L1 N and L2 N 3 steady state L1 L2 5 steady state C Frequency Regulation 3 5Hz synchronized to utility mains 0 1Hz free running or on battery operation D Frequency Slew Rate 1 0H...

Page 6: ...harge compliant to EN61000 4 2 level 4 Criteria A without damage and shall not affect the connected load 1 5 USER DOCUMENTATION The specified UPS system shall be supplied with a Safety Warning Sheet T...

Page 7: ...llable lead acid cells housed in a separate cabinet that matches the UPS cabinet styling The cabinet shall be cleaned primed and painted Black RAL 7021 The external battery system shall be sized to pr...

Page 8: ...ritical load shall be transferred to internal bypass 2 2 2 Inverters 2 2 2 1 General The UPS inverters shall be of a pulse width modulated PWM IGBT design capable of providing the specified AC output...

Page 9: ...ostics AC Input indicator 1 green LED The AC Input indicator LED shall be illuminated when utility power is available and falls within the input specification UPS ON indicator 1 green LED The On Inver...

Page 10: ...ed load and power factor with an ambient temperature of 77 F 25 C for a minimum of 5 minutes reserve time The expected life of the battery shall be 3 5 years or a minimum 250 complete discharge cycles...

Page 11: ...Liebert GXT3 5000 6000RT208 SL 23188_REV1_08 10 11 Guide Specifications PD2 006 NEMA L14 30P 4 L6 20R Included...

Page 12: ...SLOT COMMUNICATION OPTIONS The UPS shall include one Liebert IntelliSlot communication port to allow the operator to field install optional Liebert IntelliSlot communication cards Liebert IntelliSlot...

Page 13: ...put voltages to match input voltages of 200 100 220 110 220 127 230 115 or 240 120 Enable Disable Auto Restart Select frequency converter operation with a fixed output frequency of 50 or 60Hz Bypass i...

Reviews: