26
0
1
2
3
4
5
6
1/2
1/2
1/2
1/2
1/2
1/2
STEP 32:
FIGURE 32
• Screw the threaded end of AB CABLE (45) approximately 1” into
the end of the PULLEY BRACKET (26) and tighten jam nut se-
curely as shown in FIGURE 32.
IMPORTANT!
Make sure the cables are running
in the grooves of all pulleys.
3/8 X 2” 89
82
AB CABLE 45
26
• Route the AB CABLE (45) around the FLOATING PULLEY
BRACKET (55) using one 4-1/2” PULLEY (48), one 3/8 X 2”
BOLT (89), two 2-7/8 X 1” CABLE CLIPS (67), two 3/8” LOCK
NUTS (82). See FIGURE 32.
55
67
STEP 31:
FIGURE 31
DETAIL 31
45 AB CABLE
95 3/8 X 3-1/4”
117
SEE DETAIL 31
• Securely assemble the ball end of the AB CABLE (45) and one 4-1/2” PULLEY (48) to the FRONT UPRIGHT (29) using two AB PULLEY
PLATES (117), two 3/8 X 3-1/4” BOLTS (91), four 1/4” SPACERS (118), two 3/8” FLANGE SPACERS (69), two 3/8” WASHERS (80) and
four 3/8” LOCKNUTS (82) .
(NOTE: The AB CABLE (45) should be routed underneath the retaining bolt as shown in DETAIL 3.)
118
48
69
80