14
1
9
9
1
9
28
31
28
60
18
18
60
18
28
31 18 28
STEP 8
Insert the Front Post (9) onto the tube of the Main Frame (1) and secure with eight Hexagon
Socket Pan Head Cap Bolts (28), eight Spring Washers (18), and four Washers (31), and
four Curve Washers (60) that were removed. Tighten bolts with the Allen Wrench provided.
STEP 9
Remove one Cross Recessed Pan Head Bolt (59) and one Washer (35) from the Tension
Control Knob (15). Remove bolt with the Multi Hex Tool with Phillips Screwdriver provided.
59
35
15