background image

Initial Set Up

A.

 

Screw in plugs on each side of the manifold

 

Make sure plug “O” rings are seated properly. 

 

The bottom inlet ports will not be needed 

 

in this type of installation. Wrap threads with 

 

thread seal tape. (‘O-rings need periodic silicone lubrication). 

B.  

Wrap thread seal tape on the male threads of one 3/4” MPT x 1/2” barb

                                                      elbow and the waterfall assembly. Wrap each

                                                           fitting 5-7 times with thread seal tape. 

                                                             Only one 3/4” MPT x 1/2” barb elbow will

                                                              be needed for this type of installation. 

C.  

Screw in the 3/4” MPT x 1/2” barb elbow into top inlet port 

NOTE

 the

  

inlet port is located in front of the UV light indicator. 

D.  

Screw in the waterfall assembly into the 

 

outlet port located at the top of

 

the AquaStep PRO.

E.  

Slide the rubber gasket 

 

onto the hard quartz

 

sleeve so that the edge

 

of the sleeve is visible as  

 

shown below (Fig. F). 

F.  

Slide the quartz sleeve into the

 

AquaStep PRO unit.

G.  

Screw on the quartz sleeve cap.

 

Hand tighten only.

H.  

Take out the bulb and ballast 

 

from the box. Connect the bulb 

 

to  the ballast. Note: there is only  

 

 

one way to connect the bulb to   

 

the ballast. The four pin

UV Light 

Indicator

Outlet Port

Inlet Port

A.

Threaded Seal Tape

Threaded Seal Tape

B.

C.

D.

E.

F.

G.

H.

I.

INSTRUCTION MANUAL 

AQUA STEP PRO

UV Sterilizer

15 Watt & 25 Watt Models

1

®

Reviews: