10
3. Left/Right Handrail Arms, Left/Right Foot Bars, Left/Right Foot Pedals, and Foot
Bar Covers-A/B Installation
Remove two M8x20 Bolts (40), two Ø8 Spring Washers (41), two Ø8 Big Washers (46), and
two Ø38x3 Washers (42) from the left and right horizontal axes of the Front Post (5).
Remove bolts with the S6 Allen Wrench provided.
Attach the Left Handrail Arm (3L) onto the left horizontal axis of the Front Post (5) with one
M8x20 Bolt (40), one Ø8 Spring Washer (41), one Ø8 Big Washer (46), and one Ø38x3
Washer (42) that were removed. Tighten bolts with the S6 Allen Wrench provided.
Attach the left U Shape Bracket (20) to the left Crank (75) with one 1/2” Bolt for left U Shape
Bracket (13L), one Ø28xØ17x0.3 Wave Washer (15), Ø20 Spring Washer (17), and 1/2”
Left Nylon Nut (14L). Tighten bolt and nylon nut with the S8 Allen Wrench and Multi Hex
Tool provided. Install a S13 Bolt Cap (28) onto the M8x50 Bolt (23).
NOTE: 1/2” Bolt for left U Shape Bracket (13L) and 1/2” Bolt for right U Shape Bracket
(13R) are marked “R” for Right and “L” for Left.
Attach the Left Foot Pedal (33) onto the Left Foot Bar (2L) with three M6 Nylon Nuts (24),
three Ø6xØ12x1 Washers (25), and three M6x40 Bolts (26). Tighten nylon nuts with the
Multi Hex Tool with Phillips Screwdriver provided.
Remove four ST4.2x25 Phillips Self Tapping Screws (60) from Left and Right Foot Bars (2L).
Attach the Foot Bar Covers-A/B (30L, 30R) onto the Left Foot Bar (2L) with one ST4.2x25
Screws (29) and two ST4.2x25 Phillips Self Tapping Screws (60) that were removed.
Tighten screws with the Multi Hex Tool with Phillips Screwdriver provided.
Repeat above step to attach the Right Handrail Arm (3R) onto the right horizontal axis of the
Front Post (5) and right U Shape Bracket (20) to the right Crank (75).
Multi Hex Tool
S10, S13, S17, S19
Allen Wrench S8
Multi Hex Tool with Phillips Screwdriver
S10, S13, S14, S15
Tool:
60
26
60
30L
30R
3R
2R
48
5
33
2L
15 13R
24
25
29
3L
43
40
41
46
17
14R
13L
15
17
14L
28
75
20
20
28
23
23
Allen Wrench S6