5
STE P 1
○
B
○
M
○
D
See glider
- You must comply with connector and ring position indications.
- E nsure that connectors are correctly aligned.
STE P 2
○
N2
○
N1
○
N1
○
N2
Hook: 4PCS
○
N2
○
N1
STE P3
○
O
○
O
M8X150MM
M6X55MM
8PCS
2PCS
M6X130MM 4PCS
M5X25MM
2PCS
M8X130MM 1PC
M8X150MM
4PCS
To ensure the swing frame’s geometry is correct,
please comply carefully with the depth indications
when placing the wooden posts in the connector.
It is best to place the swing frame and assemble it on
the ground.
You will be required to raise the product during the
next step
Holes are pre-drilled