MAINTENANCE SCHEDULE
The following periodic maintenance is the suggested minimum requirements and minimum intervals;
accumulated hours or monthly period, which ever comes sooner. If you hear a noise or see any indication
of impending failure -
cease operation immediately
– inspect, correct and / or replace parts as required.
WARNING OSHA AND ANSI REQUIRE USERS TO INSPECT LIFTING EQUIPMENT AT
THE START OF EVERY SHIFT. THESE AND OTHER PERIODIC INSPECTIONS ARE
THE RESPONSIBILITY OF THE USER.
DAILY PRE-OPERATION CHECK (8 HOURS)
The user should perform daily check. ATTENTION! LOOK OUT! Daily check of safety latch system is very
important-the discovery of device failure before needed could save you from expensive property damage,
lost production time, serious personal injury and even death.
z
Check safety lock audibly and visually while in operation
z
Check safety latches for free movement and
full engagement with rack.
z
Check hydraulic connections, and hoses for leakage.
z
Check cables connections- bends, cracks-and looseness
z
Check for frayed cables in both raised and lowered position.
z
Check snap rings at all rollers and sheaves.
z
Check anchors, bolts, nut, and screws and tighten them.
z
Check wiring & switches for damage.
z
Keep base plate free of dirt, grease or any other corrosive substances.
z
Check floor for stress cracks near anchor bolts.
z
Check swing arm restraints.
WEEKLY MAINTENANCE (40 HOURS)
z
Check anchor bolts torque to 150 ft-lbs for the 19mm (3/4”) anchor bolts.
Do not use impact wrench.
z
Check floor for stress cracks near anchor bolts.
z
Check hydraulic oil level.
z
Check and tighten bolts and nuts, and screws.
z
Check cylinder for free movement.
z
Check cable pulley for free movement and excessive ware.