5
Fig. 3
2. OVERHEAD OBSTRUCTIONS: The area where the lift located should be free of overhead
obstructions such as heaters, building supports, electrical lines etc.
3. DEFECTIVE CONCRETE: Visually inspect the site where the lifts will be installed and check for
cracked or defective concrete.
4. FLOOR REQUIREMNETS: The lift should be installed on a 3000 PSI concrete with little gradients (
≦
1/
5” within area of two columns =150” * 35”,).
Summary of Contents for 165915LK
Page 16: ...PARTS DRAWING Fig A 1...
Page 17: ...Cable routing Fig A 2...