11
165928FXLK
May 2020
STEP 8: (Installing / Routing HYDRAULIC HOSES, HYDRAULIC FITTINGS & HOSE COVERS)
1. Install & connect hydraulic hoses, fittings and hose covers, as shown below in (Figs. 14-16) along
with the Exploded View #2 diagram on page 22.
NOTE: It is necessary to have hose routed through Hose Covers (Fig. 16), along with ensuring the
hydraulic 90 degree Fitting’s threads are fully tightened against the outside of Main column, as shown
in (Fig. 14 & 15).
Fig. 14 Fig. 15 Fig. 16
CAUTION! When routing the hydraulic hoses, make sure hoses & fittings are clear of any moving parts.
STEP 9: (Installing Swing Arms, Floor Plate & Arm Restraints)
1. Install the Swing Arms on the carriages using the included 1-1/2” swing arm pins to carriages, as
shown below.
2. Install Drive-Over Floor Plate between each column & secure to Base Plates with socket screws, as
shown below.