14
10. Install the fittings on cylinder(Fig. 10), and rout the hoses and pipes
A. Hose
connecting
1.
Connect the longest hose from the cylinder in off side column to the top of main side
column. Remember to rout the hose through the hook on cross beam. (Fig. 10a &
10b)
2.
Then through a T-fitting, one middle length hose connecting to the main side cylinder.
(Fig. 10c)
3.
Another shortest hose from the T-fitting goes to the motor pump. (Fig. 10d)
Fig. 10d Fig. 10c Fig. 10a
Fig. 10b
Summary of Contents for 165948BLK
Page 7: ...7 Fig 1 Front View Spec...
Page 8: ...8 Fig 2 Top View Spec...