background image

 

 

6

 

Harmonized regulations 

EN ISO 12100:2010 

Safety of machinery; Basic terminology, methodology 

EN 14492-2:2006+A1:2009  

Cranes - Power driven winches and hoists 

EN ISO 13849-1:2008 

Safety of machinery - Safety-related parts of control systems; General 
principles for design 

EN 60034-1:2004 

Rotating electrical machines; Rating and performance 

EN 60034-5:2001 

Rotating electrical machines; Degrees of protection provided by the 
integral design of rotating electrical machines 

EN 60204-32:2008 

Electrical equipment of machines; Requirements for hoisting machines 

EN 60529:1991 + A1:2000 

Degrees of protection provided by enclosures (IP-Code) 

EN 60947-1: 2007 + A1:2009 

Low-voltage switchgear and control gear 

EN 61000-6-2:2005 

Electromagnetic compatibility, Immunity for industrial environments 

EN 61000-6-3: 2007 + A1:2011 

Electromagnetic compatibility, Emission standard for residential, 
commercial and light-industrial environments 

EN 61000-6-4:2007 + A1:2011 

Electromagnetic compatibility, Emission standard for industrial 
environments 

 
 

Regulations and technical specifications 

FEM 9.511: 1986 

Rules for the design of series lifting equipment; Classification of 
mechanisms 

FEM 9.661: 1986 

Rules for the design of series lifting equipment; Dimensions and design of 
rope reeving components 

FEM 9.683: 1995 

Series lifting equipment; Selection of hoisting and travelling motors 

FEM 9.751: 1998 

Series lifting equipment; Power driven series hoist mechanisms; Safety 

FEM 9.755: 1993 

Serial hoist units; Measures for achieving safe working periods 

DIN 15020: 1974 

Principles relating to rope drives 

EN 12385-4:2002 + A1:2008 

Steel wire ropes; Safety 

 
The producers guarantee depends on consideration of these regulations and all of this manual. 
 

Please pay attention to chapter 5 especially!

 

Other national regulations are valid for countries outside of the European community. 
 
Maintenance work for hoisting equipment has to be carried out by trained and authorised people only. 
The main switch has to be switched off before. 

 

 

 
Trained specialists 

are highly qualified specialist personnel and have to have a theoretical training as well as long 

term experience in the field of winches, hoists or cranes. They have to have an excellent know-how of the special 
regulations and must be able to decide whether the lifting equipment is in a safe working condition or not. 
 
They have to fill in the forms of any maintenance work, repair work or test. 
 
The wire rope winch has allowed only to be used by people who have complete knowledge of this manual; the 
manual should always available showing who has signed the form on the rear cover of this brochure. 
 
 

1.3 

Spare parts 

 
Only original spare parts must be used. The producers guarantee is given for those spare parts only. 
The producer cannot be held responsible for failures and breakdowns caused by use of not original or wrong spare 
parts. 

Summary of Contents for LSF 200/1-15

Page 1: ...rating Instructions Wire rope winch Type LSF 200 1 15 Please do not use the electric chain hoist before all operators have carefully read and understood this manual and signed the form on the rear cov...

Page 2: ...2 LIFTKET Hoffmann GmbH Dresdener Stra e 66 68 04808 Wurzen Germany 49 3425 89 24 0 49 3425 89 24 99 sales liftket de www liftket de Ho 08 2017 englisch Original operating instructions 2017...

Page 3: ...0 4 3 1 Layout 10 4 3 2 Adjustment of the electric limit switch 11 4 3 3 Hazardous operations 11 5 Directions and prohibitions for use 12 5 1 Directions for use 12 5 2 Prohibitions of use 12 6 Mainten...

Page 4: ...4...

Page 5: ...ecessarily cover all situations If you are in any doubt please contact your dealer This manual will tell you how to operate the wire rope winch and how to handle its suspension or its loads safely It...

Page 6: ...hoisting and travelling motors FEM 9 751 1998 Series lifting equipment Power driven series hoist mechanisms Safety FEM 9 755 1993 Serial hoist units Measures for achieving safe working periods DIN 15...

Page 7: ...of the wire rope winch kg 42 fuse A 10 cable for power supply mm 5 G 1 5 intermittent duty duty rate starts per hour 40 ED 120 S h short time duty min 40 description of short time duty Short time dut...

Page 8: ...d Check that the rope winds properly onto the drum on initial use If the rope winds onto one side of the drum only please check if the winch is fitted absolutely horizontally In case of loose rope the...

Page 9: ...required Caution The wall surface must be horizontal Test Check the correct assembly according to point 3 1 4 Electrical connections After installation check that it has been done in accordance with t...

Page 10: ...or the mains connection are located in the separate control box A cable 4G1 5 minimum cross section 1 5 mm is necessary for the mains connection After connecting press button for lifting If the load m...

Page 11: ...he highest hook position is reached in this case the limit switch won t work anymore and this could cause a rope or winch casing to break and the load to be dropped Further operation of the wire rope...

Page 12: ...visible all the times for the operator and if more than one person is involved in the operation they must be able to communicate with each other at all times If the hoist is not in use the load must...

Page 13: ...qualified specialist personnel or the manufacturer s after sales service personnel If the hoist is in heavy use two or three shifts high percentage of work with nominal load dusty or high temperature...

Page 14: ...81 5 m and the diameter of it 5 mm The drum therefore is designed for 5 layers of wire rope Figure 9 Replacement of the wire rope at the drum Assembly instructions Release the wire rope by pressing t...

Page 15: ...C disk brake The brake is supplied by a rectifier circuit which is located in the control box It operates according to the fail safe principle If there is a power failure the brake acts automatically...

Page 16: ...r by use of the hexagon screws 3x M5 5 Tighten the screws with equivalent torque of 5 5 Nm Assembly of the hub onto the shaft Assembly of the DC disk brake on the gear cover Tightening by a torque wre...

Page 17: ...lar intervals 3 months minimum if very dirty concrete cement this work should be done more often Supplier Designation Application Elaskon Elaskon SK H Secondary lubrication Elaskon Elaskon 30 Secondar...

Page 18: ...components have reached the end of the S W P the wire rope winch or its components have to be overhauled or to be taken finally out of operation The parts have to be disposed in accordance to the law...

Page 19: ...19...

Page 20: ...rther information for other fields of operation are not considered herewith If changes to the normal operations are discovered such as unusual noise vibrations higher input current or frequently blowi...

Reviews: