Installation Instructions GE Lighting Filtr-Gard®
LED-8929***-HAZ & LED-8929***C-HAZ
Instructions for retrofitting the following UL
Listed GE Lighting Filtr-Gard® Luminaire
Fitting/Ballast Housing marked for Use in Class
I, Division 2, Groups A, B, C and D Hazardous
Locations
Filtr-Gard® is a register trademark of
General Electric Company
Fitting
Filtr-Gard® Catalog #
Ballast Housing
Series H2 ballast
housings
Cover/Mounting
Series H2000 mounts
Optical Assembly
Series H2000 opticals
Tools needed:
1. Slotted screwdriver or wrench to open cover
2. Wire cutter
3. Wire Stripper
Note:
The luminaire does not need to be removed
from the mounting surface prior to
modification.
Retrofit Kit Selection Table
Ballast Housing
Retrofit Kit
H2*05K, H2*05L,
H2*10M
LED-8929E**-HAZ
All Others
LED-8929M**-HAZ
2
1. Disconnect electrical power to the luminaire at
the supply source
CAUTION
–
Risk of burn, allow luminaire
and lamp to cool before proceeding
3. Allow the ballast cover to hinge open and
disconnect the quick disconnect between the
cover and housing by pulling the two black
plastic connectors apart.
4. Cut the black and white wires from the quick
disconnect to the ballast circuitry leaving as
much wire to the quick disconnect as possible.
Be careful to leave the green ground wire
connected.
5. Cut the white (neutral) and colored (hot) wires
from the lamp holder in the center of the
ballast housing leaving as much wire to the
lamp holder as possible.
6. Strip 3/8 inch from the incoming quick
disconnect wires from step four and the lamp
holder wires from step five. Using the
included wire connectors to connect white to
white and black to colored (may be black).
Wiring
2. Open luminaire by loosening the screw that
holds the ballast housing and cover together