Lighthouse S3100/S5100/Boulder Counter Operating Manual
6-74
248083389-1 Rev
Based on the minimum requirements displayed Table 6-1, configure the
instrument as follows:
•
Press MAIN to return to the MAIN screen.
•
Press CONFIG to enter the Configuration screen.
•
Press SAMPLE to set the Sample time.
•
Press the VOLUME button to set the instrument’s sample volume.
•
Type in 146 and press ENTER. This sets the instrument for the
channel size with the largest minimum volume requirement.
Note:
The Sample time
automatically changes to 1:28
(1 minute, 28 seconds).
•
Press the CYCLES button.
•
Set the CYCLES value for 1 and press ENTER.
Note:
This is all that is
needed to meet the minimum
requirements to classify the
report.
Increase any of the
configuration parameters in
order to meet additional
reporting needs.
•
Press the MAIN button.
•
Press the Location Select button at the top of the screen.
•
Select the location where the first measurement will be taken.
•
Press START. Let the instrument record 1 sample at the first
location.
•
After the instrument has recorded the sample, change the Location
using the Location Select button.
•
Then move the instrument to the second location and press START.
•
After the instrument has recorded the second sample, continue to
change the Location setting before recording at the next location,
then move it to the third and forth locations, taking at least one
sample at each location. At one location take 2 samples.
•
After the instrument finishes recording at the last location, and the
instrument has a total of at least 5 samples, the instrument is ready
to print the report.
Report Output Setup
The Report output can be directed to either the thermal printer or to a
USB flash drive. To change the destination, press CONFIG then
OUTPUT. Choose USB to output reports to the Flash Drive.
Summary of Contents for solair 3100
Page 1: ......
Page 2: ...00...
Page 3: ...Lighthouse Worldwide Solutions S3100 S5100 Boulder Counter Gen E Operating Manual...
Page 6: ......
Page 12: ...Lighthouse S3100 S5100 Boulder Counter Operating Manual t vi 248083389 1 Rev...
Page 14: ...Lighthouse S3100 S5100 Boulder Counter Operating Manual ii 248083389 1 Rev...
Page 19: ...Introduction 248083389 1 Rev 2 3 Figure 2 1 SOLAIR Dimensions Side Dimensions Top Dimensions...
Page 22: ...Lighthouse S3100 S5100 Boulder Counter Operating Manual 2 6 248083389 1 Rev...
Page 36: ...Lighthouse S3100 S5100 Boulder Counter Operating Manual 3 14 248083389 1 Rev...
Page 60: ...Lighthouse S3100 S5100 Boulder Counter Operating Manual 4 24 248083389 1 Rev...
Page 66: ...Lighthouse S3100 S5100 Boulder Counter Operating Manual 5 6 248083389 1 Rev...
Page 115: ...Operating Counter 248083389 1 Rev 6 49 Figure 6 64 SOLAIR 3100 STATUS Screen...
Page 180: ...Lighthouse S3100 S5100 Boulder Counter Operating Manual D 2 248083389 1 Rev...
Page 187: ...00...
Page 188: ......