Document 36 II Stormaster Version 1.02 © Copyright 2008 LPI
13
Checking Lightning Protection Components
Supplied
The LPI Stormaster ESE components received should be checked against the “Bill of materials”
for loss during shipping and for damage.
Check the following:
Terminal(s)
• Terminals have not been dented or damaged in any way during transit.
• Instructions, warning labels, warranty, test certificate and relevant mast base components
are supplied
Downconductor(s)
• The HVSC cable drum (if supplied) is not damaged.
• The correct HVSC length(s) have been supplied.
• No obvious damage to the HVSC cable.
• If a factory completed upper termination is supplied, check to see that the termination is
not damaged and confirm inside or outside termination(s).
• Order of lengths and quantities of HVSC (if multiple lengths on one drum), will be shown
on the side of the Cable Drum(s).
LPI Stormaster ESE Installation
All site and safety requirements must be followed during the installation of the LPI Stormaster
ESE.
The correct order of installation is as follows:
1. Installation of the lightning earth.
2. Installation of the HVSC downconductor.
3. Lower termination of the HVSC downconductor and connection to the lightning earth.
Summary of Contents for Stormaster 15
Page 1: ...HidgbVhiZg H LIGHTNING PROTECTION INTERNATIONAL PTY LTD ABN 11 099 190 897 www lpi com au...
Page 14: ...12 Document 36 II Stormaster Version 1 02 Copyright 2008 LPI Figure 8...
Page 50: ...48 Document 36 II Stormaster Version 1 02 Copyright 2008 LPI Installation Notes...
Page 51: ...Inside Back Cover Blank...