34
Document 36 II Stormaster Version 1.02 © Copyright 2008 LPI
Figure 33.
Figure 34.
14. Place the 2
nd
600mm Heatshrink tube into place over the cable, again ensuring that the
Semi-Conductive tape is not damaged, overlapping the previous Heatshrink tube by at
least 3cm. Shrink about 7cm of the upper end of the Heatshrink into place so that it will
sit flush with the base of the Plastic Mast Butt Adaptor when fitted back into place.
Shrink the rest of the Heatshrink, ensuring that it overlaps the previous piece of
Heatshrink by at Least 3cm. (Figure 34) Ensure the rest of the Heatshrink has a smooth
overall finish. Note; If required, feed the cable through the mast sections & guying ring.
Replace the plastic Mast Butt Adaptor section of the Terminal Base Assembly back onto
the brass connector and ensure that the M6 Phillips Head screw is tight and secure.
15. The lugged HVSC is now ready to be connected to the base of the Stormaster terminal.
Screw the terminal onto the completed Terminal Base Assembly and secure with the
supplied M6 locking grub screw.
Summary of Contents for Stormaster 15
Page 1: ...HidgbVhiZg H LIGHTNING PROTECTION INTERNATIONAL PTY LTD ABN 11 099 190 897 www lpi com au...
Page 14: ...12 Document 36 II Stormaster Version 1 02 Copyright 2008 LPI Figure 8...
Page 50: ...48 Document 36 II Stormaster Version 1 02 Copyright 2008 LPI Installation Notes...
Page 51: ...Inside Back Cover Blank...