background image

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

INSTALLATION OF CABLE PENDANT KIT ONTO 
CEILING (Fig. 1) 

(NOTE: If custom length is required see below.) 

1. Bring supply leads from OCTAGON OUTLET BOX and fixture leads 
    through the cutout of MOUNTING PLATE. 
2. Thread OUTLET BOX SCREWS through slots in MOUNTING 
    PLATE to OUTLET BOX. 
3. Make Connections.  Bare Copper and/or green insulation wire(s) 
    must be connected to SUPPLY GROUND.  Connect WHITE  
    LEAD to NEUTRAL (WHITE) SUPPLY LEAD.  Connect BLACK 
    LEAD to HOT SUPPLY LEAD.  Use wire nuts (local hardware items).
    Push spliced leads into outlet box. 
4. Place CANOPY through THREADED NIPPLE over MOUNTING  
    PLATE and push up against ceiling, then tighten LOCK NUT. 
 

INSTRUCTIONS FOR SHORTENING CABLES and  
POWER CORD (Fig. 1 & 2) 

Shorten the cable and cord before the kit is installed to avoid excess 
cables in the internal wiring area.  If it is necessary to install the kit  
first, then follow the installation steps below. 
1. Height Adjustment: To raise SUPPORT COVER, push CABLE up   
    into HANGER FITTING.  To lower SUPPORT COVER, push up on 
    Plunger and allow SUPPORT COVER to drop to desired height.  
    Once SUPPORT COVER is set to the desired height, remove 
    LOCK NUT from CANOPY and lower onto top of SUPPORT COVER.
    If necessary, cut excess CABLE from the back of canopy, leave 
    about 2” long or cap ends with wire nuts.       
2. Reinstall CANOPY back to MOUNTING PLATE with LOCKNUT. 
3. Push excess POWER CORD down, and have it loose above   
    SUPPORT COVER to ensure the power cord is not supporting the 
    support cover and cylinder; leave enough length for restripping the  
    cord.  Cut excess at the end of POWER CORD and restrip the ends.
    Tighten SET SCREW into CORD BUSHING to secure POWER  
    CORD. (Fig. 2 ) 
 

INSTALLATION OF CEILING MOUNT CYLINDER TO  
CABLE PENDANT KIT (Fig. 1 & 2) 

1. Make Connections.  Bare Copper and/or green insulation wire(s) 
    must be connected to SUPPLY GROUND.  Connect WHITE  
    BALLAST LEAD to NEUTRAL (WHITE) SUPPLY LEAD.  Connect  
    BLACK BALLAST LEAD to HOT SUPPLY LEAD.  Use wire nuts 
    (provided).  Place spliced leads into SUPPORT COVER. 
2.  Remove (3) THUMB NUTS from SUPPORT COVER, and discard. 
3.  Align (3) holes in SUPPORT COVER with (3) tap holes in top of 
 

CYLINDER (not shown),  then tighten with (3)  LOCK BUSHINGS. 

OUTLET BOX 
SCREWS

MOUNTING 
PLATE

THREADED

NIPPLE

LOCK NUT

CABLE

CANOPY

LOCK 
BUSHING

POWER
CORD

HANGER FITTING

SUPPORT 
COVER

THUMB NUT

FIXTURE 
LEADS

CUTOUT

PLUNGER

FIG. 1

OCTAGON 
OUTLET BOX
(BY OTHERS)

 

SUPPORT 
COVER

LOCK 
BUSHING

FIG. 2

CORD 
BUSHING

 

COMPANY

631 Airport Road, Fall River, MA 02720 

READ AND UNDERSTAND THESE INSTRUCTIONS BEFORE INSTALLING FIXTURE

This fixture is intended for installation in accordance with the National Electrical Code and local regulations.  To 

assure full compliance with local codes and regulations, check with your local electrical inspector before 

installation.  To prevent electric shock, turn off electricity at fuse box before proceeding. 

Retain these instructions for maintenance reference.

INSTRUCTION SHEET NO.

IS:CACP 

Page 1 of 1

A0604 

INSTALLATION PROCEDURE FOR: CEILING MOUNT CABLE PENDANT KIT CACP SERIES 

USED WITH CEILING MOUNT CYLINDERS (ORDER SEPARATELY) 

WARNING: 

USE ONLY FIXTURE PROVIDED BY LIGHTOLIER.  USE OF OTHER MANUFACTURES’ FIXTURES MAY VOID 

THE UNDERWRITERS LABRATORIES LISTING AND COULD CONSTITUTE A FIRE HAZARD.

 

Reviews: