READ AND UNDERSTAND THESE INSTRUCTIONS BEFORE INSTALLING FIXTURE.

This fixture is intended for installation in accordance with the National Electrical Code and local or Federal
code specifications. To assure full compliance with codes and regulations, check with your local electrical
inspector before installation. To prevent electrical shock, turn off electricity at fuse box before proceeding.

Retain these instructions for maintenance reference.

LIGHTOLIER a GENLYTE THOMAS  company.

631 Airport Road, Fall River, MA  02720

®

INSTRUCTION SHEET NO.

IS:1102T

E0403

Page 1 of 2

Instructions for Compact Fluorescent Frame-In Kit Installation

WARNING –  (RISK OF FIRE) 

Do not install insulation within 3 inches of fixture sides or wiring 

compartments, nor above fixture in such a manner as to entrap heat.

LOCKING SCREW

CENTERING
SLOTS

ADJUSTABLE
MOUNTING
BARS

 

 

up

MOUNTING

FRAME

ROTO CLIP

CEILING MATERIAL

Fig. C

Fig. D

Fig. A

FRAME-IN 

A. WOOD JOIST/METAL STUD CONSTRUCTION 

1. Position Frame-In Kit opening.* Mounting bars can be

repositioned to narrow side of frame if required to
locate fixture opening as desired. Extend mounting
bars, line up bottom edge of bars with bottom of wood
joist/metal stud and nail in place. For metal stud (Fig.
A2), fasten with machine screws through holes in the
mounting bars. Locking screws are provided to lock
mounting bars in place once positioned properly (Fig. A).

2. For multiple fixture installations, use centered slots as

guides to align adjacent fixture (Fig. A).

B.  SUSPENDED CEILING SYSTEM 

1. Position Frame-In Kit opening.* Mounting bars can be

repositioned to narrow side of frame if required to
locate fixture opening as desired. Extend mounting
bars, until notched opening fits on top of T-Bar. 
(

NOTE:

Make certain that the bottom of the mounting

frame is no higher than 1” above the ceiling line).

2. Lock mounting bars by bending tab underneath T-Bar

bead (Fig. B1), or by using screws for round T-Bar bead
(Fig. B2).

WIRE-IN

1.   White fixture leads to neutral (white) supply lead.

Black fixture leads to hot (black) supply leads. 
Bare copper and/or green insulated wire(s) must all be
connected to supply ground. Use wirenuts for splices
(local hardware item). Place all electrical connections
in the J-Box.

2. For ROMEX or BX cable use built-in cable clamp in 

J-Box.

CLOSE-IN

1.   Install plasterboard or other dry type ceiling.
2. Hole in plasterboard can be cut by using mounting

frame opening as a guide (Fig. C) (make sure roto clips
are rotated counterclockwise out of the hole area, see
Fig. D).

3. For wet plaster ceilings, use plaster Ring Accessory

No. 1961 (ordered separately).

* See Page 2 for Frame-In Kit installation when using

wall washer trim (1135).

LINE UP BOTTOM EDGE
WITH BOTTOM OF WOOD
JOIST

MOUNTING 

FRAME

MOUNTING BAR

MOUNTING BAR

Fig. A1

Fig. A2

See Reflector Trim Instruction Sheet for Trim Installation

Fig. B

1” MAX.

NOTCHED
OPENING

1-1/2” MAX.

ADJUSTABLE
MOUNTING
BARS

T-BAR

B1

B2

WARNING –  

Use only reflector trims provided by Lightolier. Use of other Manufacturers’ reflector trims voids

the Underwriters Laboratories listing and could constitute a fire hazard.