background image

VR PARABOLIC

VRA1G12LS132

Page 1 of 2

1'x4' RECESSED FLUORESCENT, 3" DEEP, 12 CELL (1 ROW) PARABOLIC LOUVER

STATIC OR AIR SUPPLY/RETURN, 2 LAMP T8 OR T12

MOUNTING METHODS

DIMENSIONS

Job Information

Type:

Job Name:
Cat. No.:

Lamp(s):
Volts/Ballast:

Lightolier 

a Genlyte Thomas Company

www.lightolier.com

Technical Information: (978) 657-7600 • Fax (978) 658-0595
631 Airport Road, Fall River, MA 02720 • (508) 679-8131 • Fax (508) 674-4710
We reserve the right to change details of design, materials and finish.
© 2002 Genlyte Thomas Group LLC (Lightolier Division)
A0902

SECTION 2/Folio G05-37 REV. A

Features

• 60.3% efficient (T8).
• 1.4 spacing mounting ratio.
• Semi-specular low iridescence pre-anodized louver.
• Vertical grain on louver eliminates reflected lamp image on cross

baffle.

• Louver frame with integrated positive light stop.
• Spring loaded latches (self centering).
• Reversible louver hinging.
• Louver has protective dust guard.
• Only 6-5/8" deep body.
• Black housing exterior for cooler ballast operating temperature.
• Turned-in edges for safe handling.
• Built-in earthquake clip (pat. no. 5,072,344).
• UL-Listed twin knockout access plate.
• Air closure strips (optional).
• Construction to meet NYC Code or Chicago Plenum is available.

G

exposed T-grid ceiling.

T

exposed slot T-grid ceiling.

F

plaster ceiling/flanged.

T

direct concealed two directional
T-grid ceiling.

earthquake clip

installed

12"

Accoustical
material
by others

1-1/2" max.

9/16"

Exposed slot 
T-bar by others

Plaster 
Opening
12-1/8"

12-11/16"

13/16"

Aluminum 

flange trim

Plaster
by others

1-1/8" min
3-3/4" max.

Plaster frame

must be

ordered 

separately

earthquake clip

before

installation

6-1/2"

(165mm)

12"

(305mm)

1/4" max.

Accoustical
material
by others

12"

15/16" or 1"

Exposed T-bar 

by others

1-1/2" max.

12"

3/8"

Accoustical
material
by others

1-7/8"

max.

1/4" max.

Reviews: