IS792 ECN 4879
Page 20 of 37
These settings remain active until another cycle is selected. The hard chill process
switches from the first step to the second step once the period of time established by
parameter
P18
(45mins from factory) has elapsed.
To start the cycle:
•press
B1
When the chill duration time has elapsed, the buzzer is activated for the length of time set
by parameter
P55
and the device switches to storage mode.
To interrupt the cycle:
•press
B1
4.10.5 Normal timed chilling and storage cycle
To select the cycle:
ensure the device is in "off" mode and no procedures are running
•press
B8
: display
DY1
will show the operational setpoint and LED
L8
will
switch on.
To adjust the operational setpoint:
•press
B4
or
B6
It is also possible to set the operational setpoint by means of parameter P4.
•press
B3
: display
DY2
will show the duration of the chilling step and LED
L3
will be switched on.
To alter the duration of the chilling step:
•press
B4
or
B6
It is also possible to set the chill duration time by means of parameter
P16
.
These settings remain active until another cycle is selected.
To start the cycle:
•press
B1
When the chill duration time has elapsed, the buzzer is activated for the length of time set
by parameter
P55
and the device switches to storage mode.
To interrupt the cycle:
•press
B1
4.10.6 Timed freezing and storage cycle
To select the cycle:
•ensure the device is in "off" mode and no procedures are running