background image

12 

 

J5/J10 Component Replacement.

 

 

Ignitor Electrode and Pilot Jet

 

1.

 

Undo pilot gas feed pipe, the pilot jet will come away when the pipe is removed. 

2.

 

Undo  two  screws  attaching    pilot  mounting  bracket  to  front  of  burner  chassis  and  drop  pilot  assembly 

clear of chassis. 

3.

 

Disconnect igniter lead from bottom of igniter. 

4.

 

Remove igniter electrode, held to bracket by a single screw. 

5.

 

Reversal of above for reassembly. Ensure pilot jet is refitted when fitting pilot pipe. 

 

 

Thermocouple. 

(This operation is easier if the pilot assembly is removed, see above). 

1.

 

Undo  the  brass  nut  on  top  of  the  bracket  which  secures  the  thermocouple  to  the  pilot  bracket  and  pull 

down. 

2.

 

Undo the nut holding the thermocouple into the rear of the valve. 

3.

 

Disconnect the wires from the interrupter terminal block 

4.

 

Replace the thermocouple  

5.

 

Reversal of the above for re assembly.

 

  

Thermopile. 

1.

 

Disconnect the thermopile lead at the control valve. 

2.

 

Loosen the thermopile retaining nut

 

located underneath the pilot assembly. 

3.

 

Withdraw the thermopile from the pilot bracket. 

4.

 

Reversal of above for reassembly. 

                        

Control Thermostat.

 

1.

 

Drain fryer 

2.

 

Remove the Thermostat control knob and the control panel facia. 

3.

 

Disconnect the wires from the thermostat and remove the screws holding the thermostat to the facia. 

4.

 

Remove the small gland assembly nut where the capillary enters the tank. 

5.

 

Free the thermostat phial from thermostat clip inside tank. 

6.

 

Reversal of the above for re assembly. 

 

 

 

 

Summary of Contents for Silverlink 600 J10

Page 1: ...IS 358 ECN 3592 User and Installation Instructions Silverlink 600 Gas Fryer J5 and J10 Utensils Direct 01903 823888 Click here to order Lincat Gas Fryers...

Page 2: ...etting Heat input NOTES ON FRYING 7 8 Frying media Frying times Frying tips Oil capacity OPERATING INSTRUCTIONS 9 10 Operating instructions Preparation fo use Drainage and cleaning SERVICING 11 13 Gen...

Page 3: ...m us before you make your decision IMPORTANT Please read this page carefully before initially using the equipment WARNING This appliance must be installed and serviced by a registered engineer Whilst...

Page 4: ...de of the appliance or bank of appliances There should be a minimum clearance of 750mm between the top of the appliance and any overlying shelf or ceiling Any partitions walls or kitchen furniture in...

Page 5: ...its intended position whilst complying with the instructions as detailed in the User Document 2 Fit the upper brackets to the bottom of the unit using the screws provided 3 Loosely fit the lower brac...

Page 6: ...3 Adjustment is made via the valve s onboard governor which is situated centrally on the valve Fig 1 C 4 Remove the governor cap and turn the screw clockwise to increase the outlet pressure and anticl...

Page 7: ...d Used oil symptoms firstly indicate discolouration by darkening The oil becomes thin its fat content having become exhausted The next symptom is an unhealthy yellow foam which may appear on the surfa...

Page 8: ...is not placed into the oil FRYING TIPS 1 Always use a good quality oil or fat preferably oil which has a high breakdown temperature e g pure vegetable oil 2 Do not exceed the recommended cooking temp...

Page 9: ...in the off position Fig 3 1 Push in and turn anti clockwise to the Pilot position Fig 3 2 The knob will now depress further 4 Keeping the pilot control knob depressed press the piezo ignition button...

Page 10: ...er and provide the base of the tank with a coating of oil 5 Close the drain valve DRAINAGE 1 Always allow the oil to cool to a maximum 55 o C before draining 2 Remove the blanking nut Fig 2 e from the...

Page 11: ...ctions 3 Visually check the burner operation closely observing the flame picture and look for evidence of any debris or damage Remove burner and clean or replace as necessary 4 Visually check the inje...

Page 12: ...e pilot bracket and pull down 2 Undo the nut holding the thermocouple into the rear of the valve 3 Disconnect the wires from the interrupter terminal block 4 Replace the thermocouple 5 Reversal of the...

Page 13: ...afety Thermostat 1 Drain oil from fryer tank 2 Remove the thermostat housing and locate the thermostat 3 Remove the brass nut holding the thermostat to the housing 4 Disconnect the wires from the ther...

Page 14: ...lt system consists of a thermopile acting through the gas control via the control thermostat Heat from the pilot flame acting on the thermopile generates a 500 700 mV electrical potential This millivo...

Page 15: ...re stat for open circuit If all of the above are OK the control valve may be faulty Check pilot jet for blockage and clean where necessary Check supply Check thermocouple voltage minium 15mV Is the oi...

Page 16: ...Control Valve Technical Data Models J5 and J10 Dimensions J5 H1060 x W300 x D700 J10 H1060 x W600 x D700 Weight J5 34 8kg J10 69 5kg Inlet connection 1 2 BSP Natural Gas G20 Heat Input Gross 11 5 kWh...

Page 17: ...persons Note that for safe and efficient operation appliances need regular servicing Please quote both the model and serial numbers from the data plate attached to the unit Give brief details of the...

Reviews: