F - MAINTENANCE
8695 6650 / C
F-22
POSIMATIC PS30
Periodical servicing and controls
WEEKLY
Parts
Operations
Lubrication
PLATE
Check the tightening of the
plate fixation screws.
If an abnormality is
detected (loose screw), it is
advised to unmount
completely the plate and also
check the tightening of the
screws that hold the
positioning ring on the box.
WELDING GROUND
CONNECTION
Check the condition of the
contact surfaces.
EVERY 2 WEEKS
Parts
Operations
Lubrication
GEARS
1) Check the condition of the
teeth of the cogged sector of
the tilting mechanism
2) Grease the cogging of the
positioning ring
Grease HPG 400
BELTS
Check the tension