FineLine 300HD Plasma System
BK8053-000107 Rev A.01
This information is subject to the controls of the Export Administration Regulations [EAR]. This information shall not be provided to
non-U.S. persons or transferred by any means to any location outside the United States contrary to the requirements of the EAR.
Page 48 of 118
3.18 Installation Checklist
System is located within the specified operating environment and the
components have been placed as specified. Refer to Sections 2.0 and 3.1.
System is properly grounded according to local and national codes.
Primary power is connected to the System according to local and national codes.
The voltage selection jumper matches the supplied voltage. Refer to Section 3.4.
Gasses are connected properly. Fittings have been checked for leaks.
All System components are connected properly. Refer to Section 3.2.
Torch assembly is securely mounted and consumables are installed in the torch.
Refer to Sections 3.11 and 3.12.
All required software is installed and commissioned. Refer to Section 3.16.
Cooling system is filled with torch coolant. Reservoir cap is installed.
Fittings have been checked for leaks. Refer to Section 3.17.
All access panels and doors are closed and secured.