A-12
INSTALLATION
MODULAR FUME HOOD
™
Hanging:
1. Lift the hood, preferably using a fork-lift. See Figure A.18.
2. Mount the hood to the ceiling. See Figure A.18.
FIGURE – A.18
Standing:
1. Mount the floor mounting plates under the legs (1). See Figure
A.19.
2. Lift the hood, preferably using a fork-lift truck (2). Modular
Fume Hood XL: use two fork-lift trucks. See Figure A.19.
3. Position the legs under the corners of the hood (3). The round
sides of the legs should be directed to the inside. It is
recommended to call in four persons to hold the legs. See
Figure A.19.
4. Let down the hood easily, until it rests on all four legs. See
Figure A.19.
FIGURE – A.19
5. Make sure to position the legs as close to the corner pieces as
possible, preferably using clamps. See Figure A.20.
6. Fasten the legs to the corner pieces. See Figure A.20.
FIGURE – A.20
7. Place the corner covers. See Figure A.21.
FIGURE – A.21
Modular Fume Hood XL/standing:
1. Mount the corner reinforcements to the connection plates using
bolts and locknuts (1). See Figure A.22.
2. Mount the corner reinforcement to the legs using self-tapping
screws (2). See Figure A.22.
FIGURE – A.22
1
2
10 mm
Fig. XVIII
10 mm
1
2
1
2
10 mm
XL